Tuesday, August 4, 2009

Track Previous Bond Prices

Day 45: Self-service tile go

The holiday is our construction company is now over. But before it really goes, we must first make the rest of the internal activities of the tiles done. That is, we must lay the floor tiles.

done Said. Today we have tiled the guest bathroom, sorry no picture, the utility room and the hallway. Tomorrow, then the rest made ready. The joints have to be made even more so that it does not collect the dirt.

was the way the supply air for the chimney exposed and laid out in a shaft. The public utilities have freigebuddelt the drinking water and electric aufgeruppt ditch and the road for sewage. In addition, "very secret" range makes the nets at the ground-level windows in the floor. The lack of joints in two terrace windows were installed.

Tomorrow is a meeting with the supervisor, where we will discuss the rest of everything else and vote. This then more tomorrow.