Sunday, August 30, 2009

Wires Out Of Wall 1 Red 2black 1green

Day 1 day 68 after removal

Now we just need to do "a few remaining tasks. We have begun to lay parquet flooring in the living room and kitchen and loft our floor interpreted so that when we move and have "enough" storage space.


Sprites Naruto: Ninja Council4 Ds

08/28/2009 27/08/2009 decrease

It's done really. Just before 10 weeks (in construction) We were told the date for acceptance by our construction company Bauunion 1905. And he was respected. Punctual, as always, were 9 of the clock construction manager, our production company and of course we at the house. Each room is from top to bottom checked for completeness and functionality of all installed components. In addition, even were a representatives of the plumbing and heating company Heimann and a representative of the windows and door company Jacob on site. We have received a full briefing in our new heating system with heat recovery, all doors and windows were set once again to our satisfaction, so that all the wings, Locks and doors close properly and our site manager Hr. Gehrke has eliminated even a scratch on stairs and walls and would have even the last day of construction work damaged wall paint repair. After that the famous blower door test was applied and accepted without objection.

The only thing was to complain about was our non-deliverable faucets bathroom. Therefore, first replacement valves were installed, so that we can use everything in full. A mishap happened in the sanitation company, though. Handtuchtheizkörpers in mounting the tiles are broken, so now again someone has ran. Unfortunately, this has not been clarified.

After plenty of signatures and now 3 hours we Item 12 clock become a homeowner. We were handed the keys to the house.

Tuesday, August 25, 2009

Horse Turnout Recommendation

Day 65: Finish gemalert - the internal doors are in there

So, now coming to the end of the construction phase. In 2 days, house delivery. In recent days we have gemalert over, tiled and little things done. The color is now on all the walls and looks stunning.

came today then the inner doors and the bottom rack stairs to our loft.

The interior doors look really good
from, but they seem very low. But this is deceptive determined. In any case we are glad that we chose for doors with profile. This completes the villa concept really did well.

morning then to the fixtures, the carpet and other little things to be done. After all, the day after tomorrow be ready. Finally, we do this coming weekend, the floorboards in the living room. And then even the kitchen and wupp - we live in the house.

are now the way the films of doors and windows off. The whole house has again quite different, especially the door.


meantime we are also a little nervous - mainly of course with joy. But the question if everything was right, as we have done it that remains. Next, we must then make the site plan so that we do not have to celebrate Leon's birthday party in sandy trenches.

Thursday, August 20, 2009

Perfect Connecticut Drivers License Template

Day 61: too done to write blog

The last days were really tiring. We have done what needed to be done diligently.
Now the steps are:

On Friday, 8/14/2009 was the pre-acceptance in our house. So far everything was fine, small things need to be fixed yet. For example. Cold paint on the cut tiles on the roof window, stairs to loft, missing window panes in the roof floor, sanding debris and plaster, ... - Everything but not so bad.

has the same time, the Lord of House, in turn, appointed excavator driver started the auszubuddeln soakaway. For that he was a mini excavators available. Unfortunately, it turned out that our soil is not particularly suitable for dredging. Much clay and silt make it difficult to "men's pleasure" significant. After long hours and much sweat, there was nevertheless a happy ending. The Sickertunnel were laid and managed the men. Of course we want all of us here at the hard-working volunteers to thank, who helped shovel to qualify for shovel forward. Thanks a million.

Saturday and Sunday was then devoted to the painting. My parents were once again on board. I think the hope we can move in with, when you help a lot - no - joking aside, the active support is wonderful and absolutely necessary. The unwavering dedication of my parents should be emphasized at this point once and mentioned having a particularly big THANK YOU.
We have then taken across the surface fabric painting on the walls, in the belief, then remove the walls to be able to easily and everything is chic.
But it is always different than you think - the painter fleece is made of small glass fibers and is therefore for a very absorbent and will cost us 3 times in color and on the other hand it must be perceived hundred emphasize that the glass fibers to the touch no longer get stuck in your hands. So the weekend ended with a serious disappointment, because we had done nothing really finished and the result was still miserable.
Monday eased the situation, as we found a solution that the painter was smooth fleece and spare your wallet in order to increase color purchase. (Who has interest in the solution, can feel free to contact us - that would cost too much run time). The excessive glue

painters and painter fleece we then run through Wednesday. The ceilings are finished, the floor - apart from the hallway - also.

on Today Thursday has only been one break. We were only at the hardware store again - our new second home - and have different wallpaper for the living room and the corridor purchased by the EC. Tomorrow there will be papered.

So now enough said. Anyone interested in the little house looks after 27.08. Just myself at times. As you can see everything live.

meantime.

Thursday, August 13, 2009

When Should I Take My Babies Mobile Off Crib?

Day 54: The staircase is inside

I could have wept for joy today because today is our staircase has been installed. The
this looks so wonderful, so we did not expect. It is so great - simply stunning. A good choice because we have taken.

morning we will einbuddeln the Sickertunnel. To this end we will rent a backhoe and excavate a nice big hole. By the way we start the afternoon with the painting, so that our house will soon get the inside color. To

9.00am tomorrow is also pre-acceptance. Unfortunately I can not be there, because I have to work. But my husband does it matter. And how I had to learn today, it was probably already an introduction to the building services. Well, let 's see if my husband can teach me that. ;-)

Tuesday, August 11, 2009

Running Shirts Sayings Women

Day 52: Sanitary installations and spackling









Well it finally happened. Date, the sink, the bathtub and the toilets anmontiert. And the best thing, now, our toilet seat all a shock absorber, that is no longer able to slam, like the drawers in the kitchen :-). On the picture you can see the tub yet installed the wrong way - but that will certainly be fixed. Message Bauunion we have already made.


have also smoothed some hard-working construction worker, the entire house.

addition was built to our Ausziehtreppe loft. This is how you can easily see, white. (A reference for insiders ;-))

Tomorrow the electrician and on Thursday comes at last the long-awaited steps.
To ensure that the electricity into the house, can we have signed the current registration, so that the counter can be connected. To our delight, we get for the electric connection of the city even more money back - exactly 42 €. Something like that is very gratifying for all expenditure.

In-house we have today ordered 15 tons of gravel for the soakaway and rented the excavator to dig the well.

Monday, August 10, 2009

Do Kaiser Insurance Cover The Abortion Pill

day 50 and 51: small family operation

On Sunday we made a small family use on the site. We have gone off with our son and have done little things.

My husband has the tiles end grouted, I felt 1,000 times wiped the floor in the hallway, we have zugeschippt the telecom and power trench, dug the drainage ditch on and ultimately we have cleaned up. Because on Monday to the construction of Bauunion go further.










Today, Monday, the people have the Bauunion started to fill in the drywall. We have brought the towel radiator to the site and looked at us, look like now Sickertunnel that were delivered. We shall then einbuddeln on Friday.

Our neighbors today poured the floor slab. Unfortunately we had today that someone has fallen over the construction site toilet, the clinker line ruptured and spread apples and pears in front of the house - what a strange "bird".


Tomorrow we will be Bauunion and spackling on. In addition, the Sanitärkeramika be installed.

Here another photo that has made our child from us. Schick, not? ;-)

Friday, August 7, 2009

Put Your Head On A Hairstyle?

Day 48: To further construction

Today there is some information without photos. After the appointment with the construction manager are now further down the building steps.

from 10-12.08.2009 the drywall trowel
from 11-13.08.2009 the fine installation of sanitary facilities

made on Thursday, 13/08/2009 is our staircase - I'm already looking forward to something and hope that it looks exactly as we imagine.

on 14.08.2009, the pre-acceptance - after a week we have for painting available

and on time on Aug 27, 2009 will then be the house delivery. It runs so everything as planned. For this purpose, again a big congratulations to the Bauunion 1905. The organization of the individual steps is really balanced almost perfectly. Thank you.

In the meantime, the hallway and the guest bathroom was tiled including joints finished. Just fill in the gaps in the utility room and the bathroom completely, the floor tiles. The window sills were installed and we are now connected to electricity and water.

More photos and details to follow again next time until then.

Tuesday, August 4, 2009

Track Previous Bond Prices

Day 45: Self-service tile go

The holiday is our construction company is now over. But before it really goes, we must first make the rest of the internal activities of the tiles done. That is, we must lay the floor tiles.

done Said. Today we have tiled the guest bathroom, sorry no picture, the utility room and the hallway. Tomorrow, then the rest made ready. The joints have to be made even more so that it does not collect the dirt.

was the way the supply air for the chimney exposed and laid out in a shaft. The public utilities have freigebuddelt the drinking water and electric aufgeruppt ditch and the road for sewage. In addition, "very secret" range makes the nets at the ground-level windows in the floor. The lack of joints in two terrace windows were installed.

Tomorrow is a meeting with the supervisor, where we will discuss the rest of everything else and vote. This then more tomorrow.

Saturday, August 1, 2009

African Spurred Tortoise Breeder In Ontario

Day 42: garden and much, much more

was early morning around 9.00 clock today on this sunny Saturday on the site. The first external or gardening on stand. We wanted to remove the entire large weeds, clear away the rubble and garbage, dig the trench for sewage and in a manner few details.

But it's like always different than you thought. The soil on the plot is as hard as stone and had to remove the weeds is therefore no longer. Since you probably need a backhoe to dig up more. Thus we started the smaller Unkrautepflanzen removed and the high grass at least once before to reduce to the minimum height. Thus we were also employed for a while.

have made me the way I to the removal of the concrete remains on the property. Is very hard work. Tomorrow I have in any case, twice as many arm muscles as today. Nevertheless, it was great fun, after all, you do it so for his own home.

Our child was always there and has supported us. He has also made new friends immediately. Our neighbors have 2 Houses continue to visit us. Today in which the blower door test was done. They have a daughter who is as old as our son. This is super.



Then we dug the drainage ditch. My honorable task consisted in the
proper exposure of the tube.

And by the way, my Schatzi sealed nor the pan and, over the last week the bathroom tiles all over and jointed.

Finally, we have now removed our utility room, attached to the mail box and the first time grilled. It's pretty much happened today. And now, we will re-register us well soon and officially move into our new home. Wonderful.

Our immediate neighbors are beginning to build also. We are very happy for you and wish you well. We'll see if that also agrees with the storks always so ... ;-)

From next week it goes back further with Bauunion, will then have to pass your vacations.