Day 1 day 68 after removal

Now we just need to do "a few remaining tasks. We have begun to lay parquet flooring in the living room and kitchen and loft our floor interpreted so that when we move and have "enough" storage space.


Sprites Naruto: Ninja Council4 Ds

08/28/2009 27/08/2009 decrease

It's done really. Just before 10 weeks (in construction) We were told the date for acceptance by our construction company Bauunion 1905. And he was respected. Punctual, as always, were 9 of the clock construction manager, our production company and of course we at the house. Each room is from top to bottom checked for completeness and functionality of all installed components. In addition, even were a representatives of the plumbing and heating company Heimann and a representative of the windows and door company Jacob on site. We have received a full briefing in our new heating system with heat recovery, all doors and windows were set once again to our satisfaction, so that all the wings, Locks and doors close properly and our site manager Hr. Gehrke has eliminated even a scratch on stairs and walls and would have even the last day of construction work damaged wall paint repair. After that the famous blower door test was applied and accepted without objection.

The only thing was to complain about was our non-deliverable faucets bathroom. Therefore, first replacement valves were installed, so that we can use everything in full. A mishap happened in the sanitation company, though. Handtuchtheizkörpers in mounting the tiles are broken, so now again someone has ran. Unfortunately, this has not been clarified.

After plenty of signatures and now 3 hours we Item 12 clock become a homeowner. We were handed the keys to the house.

Tuesday, August 25, 2009

Horse Turnout Recommendation

Day 65: Finish gemalert - the internal doors are in there

So, now coming to the end of the construction phase. In 2 days, house delivery. In recent days we have gemalert over, tiled and little things done. The color is now on all the walls and looks stunning.

came today then the inner doors and the bottom rack stairs to our loft.

The interior doors look really good
from, but they seem very low. But this is deceptive determined. In any case we are glad that we chose for doors with profile. This completes the villa concept really did well.

morning then to the fixtures, the carpet and other little things to be done. After all, the day after tomorrow be ready. Finally, we do this coming weekend, the floorboards in the living room. And then even the kitchen and wupp - we live in the house.

are now the way the films of doors and windows off. The whole house has again quite different, especially the door.


meantime we are also a little nervous - mainly of course with joy. But the question if everything was right, as we have done it that remains. Next, we must then make the site plan so that we do not have to celebrate Leon's birthday party in sandy trenches.