It's done really. Just before 10 weeks (in construction) We were told the date for acceptance by our construction company Bauunion 1905. And he was respected. Punctual, as always, were 9 of the clock construction manager, our production company and of course we at the house. Each room is from top to bottom checked for completeness and functionality of all installed components. In addition, even were a representatives of the plumbing and heating company Heimann and a representative of the windows and door company Jacob on site. We have received a full briefing in our new heating system with heat recovery, all doors and windows were set once again to our satisfaction, so that all the wings, Locks and doors close properly and our site manager Hr. Gehrke has eliminated even a scratch on stairs and walls and would have even the last day of construction work damaged wall paint repair. After that the famous blower door test was applied and accepted without objection.

The only thing was to complain about was our non-deliverable faucets bathroom. Therefore, first replacement valves were installed, so that we can use everything in full. A mishap happened in the sanitation company, though. Handtuchtheizkörpers in mounting the tiles are broken, so now again someone has ran. Unfortunately, this has not been clarified.

After plenty of signatures and now 3 hours we Item 12 clock become a homeowner. We were handed the keys to the house.

Tuesday, August 25, 2009

Horse Turnout Recommendation

Day 65: Finish gemalert - the internal doors are in there

So, now coming to the end of the construction phase. In 2 days, house delivery. In recent days we have gemalert over, tiled and little things done. The color is now on all the walls and looks stunning.

came today then the inner doors and the bottom rack stairs to our loft.

The interior doors look really good
from, but they seem very low. But this is deceptive determined. In any case we are glad that we chose for doors with profile. This completes the villa concept really did well.

morning then to the fixtures, the carpet and other little things to be done. After all, the day after tomorrow be ready. Finally, we do this coming weekend, the floorboards in the living room. And then even the kitchen and wupp - we live in the house.

are now the way the films of doors and windows off. The whole house has again quite different, especially the door.


meantime we are also a little nervous - mainly of course with joy. But the question if everything was right, as we have done it that remains. Next, we must then make the site plan so that we do not have to celebrate Leon's birthday party in sandy trenches.

Thursday, August 20, 2009

Perfect Connecticut Drivers License Template

Day 61: too done to write blog

The last days were really tiring. We have done what needed to be done diligently.
Now the steps are:

On Friday, 8/14/2009 was the pre-acceptance in our house. So far everything was fine, small things need to be fixed yet. For example. Cold paint on the cut tiles on the roof window, stairs to loft, missing window panes in the roof floor, sanding debris and plaster, ... - Everything but not so bad.

has the same time, the Lord of House, in turn, appointed excavator driver started the auszubuddeln soakaway. For that he was a mini excavators available. Unfortunately, it turned out that our soil is not particularly suitable for dredging. Much clay and silt make it difficult to "men's pleasure" significant. After long hours and much sweat, there was nevertheless a happy ending. The Sickertunnel were laid and managed the men. Of course we want all of us here at the hard-working volunteers to thank, who helped shovel to qualify for shovel forward. Thanks a million.

Saturday and Sunday was then devoted to the painting. My parents were once again on board. I think the hope we can move in with, when you help a lot - no - joking aside, the active support is wonderful and absolutely necessary. The unwavering dedication of my parents should be emphasized at this point once and mentioned having a particularly big THANK YOU.
We have then taken across the surface fabric painting on the walls, in the belief, then remove the walls to be able to easily and everything is chic.
But it is always different than you think - the painter fleece is made of small glass fibers and is therefore for a very absorbent and will cost us 3 times in color and on the other hand it must be perceived hundred emphasize that the glass fibers to the touch no longer get stuck in your hands. So the weekend ended with a serious disappointment, because we had done nothing really finished and the result was still miserable.
Monday eased the situation, as we found a solution that the painter was smooth fleece and spare your wallet in order to increase color purchase. (Who has interest in the solution, can feel free to contact us - that would cost too much run time). The excessive glue

painters and painter fleece we then run through Wednesday. The ceilings are finished, the floor - apart from the hallway - also.

on Today Thursday has only been one break. We were only at the hardware store again - our new second home - and have different wallpaper for the living room and the corridor purchased by the EC. Tomorrow there will be papered.

So now enough said. Anyone interested in the little house looks after 27.08. Just myself at times. As you can see everything live.

meantime.