Today we had the second meeting with Fa.Partnerbau (which will help us create the ground plate). This time we met
together with the utilities, the civil contractors and Fa.Partnerbau to the preparatory work on the base plate set.
The surveyor had made prior to the Grobabsteckung.
Only the garage could not be recognized as they should be on the left property line, the boundary stone in the construction of the road but on mysterious ;-) Disappeared as
............. naja our future mayor came by also to today's meeting and promised the stone appear as soon as possible back to life.

The civil contractors now handle up to week 33 time for his work, is in week 34 then the bottom plate created.

Sunday, July 8, 2007

What Free Colour Braces

appointment confirmation

............. this week we have received official confirmation of the date of finger house.
The bottom plate must be ready in week 34, the house is then placed in weeks 38th

As discussed at our sampling we received last Friday and the execution plan by email (in the form of. Pdf files).
We now check to 3 days to, if all switches are where they should be, all water flows to the basins in the right place ,.... is just that everything as we have discussed during the sampling. If everything is ok and we email back any changes, the working drawings and prints go to us for signature.