Sunday, July 8, 2007

What Free Colour Braces

appointment confirmation

............. this week we have received official confirmation of the date of finger house.
The bottom plate must be ready in week 34, the house is then placed in weeks 38th

As discussed at our sampling we received last Friday and the execution plan by email (in the form of. Pdf files).
We now check to 3 days to, if all switches are where they should be, all water flows to the basins in the right place ,.... is just that everything as we have discussed during the sampling. If everything is ok and we email back any changes, the working drawings and prints go to us for signature.

0 comments:

Post a Comment