Saturday, November 13, 2010

Triple Beampractice Worksheets



... are be reported. The planned for this week covering our house a ways off, we could therefore ask the already beuaftragte for the exploration company to postponing the meeting - hopefully it will work before winter. The structural work seems to run slower than planned.
However, this seems not yet to have been reported after King Lutter. In the accounting position, the HS-building is simply more than anything would be in the plan. On
5.11. We received an invoice for the completion of the shell and the carpenter work on our house. Apart from the obvious, that at this time not only the gables were incomplete, lacking in the EC or a few inner walls and in the DG were not a single massive inner wall.
We took as a signal to announce this by fax to the HS building. In the fax, we have also asked about the previous written clarification of the issues and dimensions of the base insulation joints.
Posted on 7/11/2010, we received no response until today.


I think, in this point and should the HS building even better - communication with their customers. Customer is king - it is nevertheless on the FIBAV posters in the stores.

Guys Peeing Their Undies



all encouragement, the many Zusprüche, the reception - the supporters and the dynamic spirit of village Tenna prepare Elan and joy in the work. Thanks to all who support us in any way!

Monday, November 8, 2010

Huge Wemen Bodybuilders

Again 3 weeks passed and it is growing

... and again is a lot happening.

In EC, the load-bearing walls were completed,


the ceiling was installed

and progress was quick with the DG.


This has now been crowned with a roof - now it already looks like a house ;-)
straightening of the roof

... and ready














Unfortunately there was not so pleasant Matters: The manufacturer of the bricks seems to be not his own quality standards in our batch - so at least the statement of our professionals from the building. Here is an excerpt
image from the brochure of the manufacturer to fit its jewels:


... and for comparison some examples of our construction



are
According to our building surveyors and construction manager of the stones are not as straight as usual. This fall, the joints between the stones as part of larger than usual. But that was not so tragic, we were reassured. All joints and columns of 5 mm were closed with a Dämmmörtel and thus incur no disadvantages.

And since you can not stand on one leg as well, there is currently a construction site in construction: the insulation of our ice wall was not performed as we had agreed this with the HS building. Apparently the info is not on the deviation from the standard arrived at or the performers. So our house decorated instead of insulation to the bottom of the ice wall "only" 30 cm insulation in the base area. But still is not over till the evening and our construction manager is already working to resolve this. We are excited and hope that the since the start of very good cooperation will continue.

the way we take care of the connection of our waste water systems - until now estimated at about 30m for it. Amazed - then take a look at some of the entries on drainage throw.

And so it does not get boring, we are in the midst of bathroom design. We want to thank you very happy at the company Nerlich & Lesser near Hoyerswerda for the great advice and prompt handling of our requests. We hope that now our plumbing company they have prepared the ground will continue. Another tip for clients looking for tiles - Kerana in Potsdam and in driving this country offers a good selection and as far as we can now assess this, a komptente advice.
And since it's so nice match, we are also equal jnoch for the right flooring for the princely rooms. Otherwise it would be too boring ...