civil contractors is actually finished :-)
the preparation of our deep-builder to create the base plate are finished. In 3 weeks now in consultation with the Fa.Partnerbau wells dug for the supply lines. Then the bottom plate should not stand in the way.
As you can see the town, the road has set quite high ... we have to heap up a lot of material to our house on the street level to rise. The only way we can ensure that later runs of the rain water from the driveway towards the road and not the house.
Public Works
.. although our civil contractors actually for another 3 weeks he had already begun preparing the ground for the bottom plate .....
2.Besprechung "bottom plate" Today we had the second meeting with Fa.Partnerbau (which will help us create the ground plate). This time we met
together with the utilities, the civil contractors and Fa.Partnerbau to the preparatory work on the base plate set.
The surveyor had made prior to the Grobabsteckung.
Only the garage could not be recognized as they should be on the left property line, the boundary stone in the construction of the road but on mysterious ;-) Disappeared as
............. naja our future mayor came by also to today's meeting and promised the stone appear as soon as possible back to life.
The civil contractors now handle up to week 33 time for his work, is in week 34 then the bottom plate created.